去查网 logo

capacity loading and scheduling system

中文翻译装载能力和计划系统

同义词释义

    1)capacity loading and scheduling system,装载能力和计划系统2)stowage planning and recording system,装载计划和记录系统3)capacity loading and schedule system,设备生产能力负荷和作业计划系统4)SNAP program,核辅助动力系统计划<能>5)system division and design,系统划分和设计6)loading plan,装载计划图

用法例句

    capacity loading and scheduling system

    装载能力和计划系统

    The Performance Simulation and Analysis on the Powertrain of 80 Wheel Loader

    80型轮式装载机动力传动系统性能仿真分析

    The Designing of Automatic Flat System and Subsidiary Function of Loader Buckets

    装载机铲斗自动放平系统及附属功能的设计

    Design and Simulation of Operation Control System for Intelligent Loader

    智能装载机作业控制系统的设计及仿真

    Intelligent Control System on Automatic Transmission of Wheel Loader

    装载机自动变速智能换挡控制系统设计

    Sucker Rod Design and Energy Conservation Analysis of Pumping System with Load Reducer

    加装减载器的抽油系统杆柱设计及节能分析

    Preliminary Research on Design and Verification of After-loading Brachytherapy Simulation System;

    后装治疗模拟计划系统设计和验证的初步研究

    A Design of Smart Home Control System Based on Power Line Carrier and Telephone Networks

    基于电力载波和电话网络的智能家电控制系统的设计

    Design of Intelligent and Remote Meter Reading System Based on GPRS and Low-voltage Power Line Carrier Communication

    基于GPRS和低压电力线载波通信的智能远程抄表系统的设计

    An Analysis to the Questionnaire on the Strategic Leadership Capability in the Family Planning System;

    计划生育系统战略领导能力调查分析

    Study on the Adaptive Route Planning System of Intelligent In-Vehicle Information Equipment;

    智能型车载信息装置的自适应路径规划系统研究

    arrange by systematic planning and united effort.

    通过联合的努力和系统的计划安排。

    Design and implenment of navigated by equipment capacity process planning and scheduling system

    设备能力导航的工艺规划和生产调度系统设计与实现

    The Design of Weaponry Productivity Calculate and Estimate System

    武器装备生产能力测算系统的设计

    Automated Testing System for IED

    电力系统智能装置自动化测试系统的设计

    An intelligent home system design based on power line carrier SC1128

    基于SC1128电力线载波芯片的智能家居系统设计

    Computing System Construction of Water Environment Carrying Capacity in Huaihe River Basin

    淮河流域水环境承载能力计算系统的构建

    The organization shall establish and implement a system for production tooling management including tool-change programmes for perishable tools.

    组织应建立和实施生产工装管理的系统包括易损工装的更换计划。

全部查询工具

关于我们免责声明联系我们网站地图最近更新

免责说明:本站为非营利性网站,本站内容全部由《去查网》从互联网搜集编辑整理而成,版权归原作者所有,如有冒犯,请联系我们删除。

Copyright © 2020 - 2024 quchaw.com All rights reserved.浙ICP备20019715号