去查网 logo

completion date

中文翻译竣工日期,完工日期,落成日期

同义词释义

    1)completion date,竣工日期;完工日期;落成日期2)completion date of construction,竣工日期3)c.d.,完工日期4)extended completion date,延迟竣工日期;延迟完工日期5)date of substantial completion,实际竣工日期6)extension of time for completion,完工日期的延期

用法例句

    Another project is under way near Fanlingcentre with a target completion date in early 1998.

    另外一项消减噪音工程将在接近粉岭中心的地点进行,预计的竣工日期为一九九八年初。

    beneficial occupancy date

    受益占用期未全部竣工的设施的预先占用日期

    The project was terminated as of January 1.

    该项目于一月一日竣工

    It is estimated that the construction will take21 months to complete.

    建设工期21个月,预计2007年5月竣工。

    The two projects will be completed by the end of September and will open to public in October.

    这两期工程将在九月底竣工,十月份向公众开放。

    After nearly half a year of intensive work, the reconstruction of the Airport North Road was finally completed on July11 th.

    经过近半年的紧张施工,机场北路改建项目11日竣工通车。

    The Three Gorges Dam is being built. We all hope the project will be completed as soon as possible!

    三峡大坝正在建设之中。我们都希望它能早日竣工。

    In May of 1937, construction was finally complete and the city was ready to celebrate.

    1937年5月,这座桥终于竣工了,整个城市充满了节日的喜庆。

    within 30 days of receipt of the text on environmental protection in the preliminary design of a construction project and the report on inspecting and accepting the completed environmental protection facilities

    初步设计环境保护篇章、环境保护设施竣工验收报告的三十日内

    Monitoring special& dangerous equipments such as CDA& crane, and continuously maintenance& annual test after completion.

    监控特种危险设备安装工程,并持续竣工后的维修和定期测试。

    The Statistical Analysis on Completion Settlement and Last Project Settlement with Cement-soil Mixing Pile to Deal With Embankment

    水泥土搅拌桩处理的路堤填筑期竣工沉降与工后沉降统计分析

    The second phase is expected to be finished by the end of next year, expanding the area to 6.88 square km.

    预计二期将于明年年底竣工,占地面积扩大到6.88平方公里。

    when the project is completed,

    在三峡工程完全竣工前,

    final accounts of the completed capital constructionproject

    基本建设工程竣工决算

    The project had been completed by the end of 1990 .

    这项工程于1990年底竣工。

    check and acceptance of the completed capitalconstruction project

    基本建设工程竣工验收

    On completion accounts and accounts record of constructional project

    浅谈建设工程竣工结算与竣工结算备案

    floor space of buildings completed by real estate enterprise was 17.074 million square meters.

    竣工面积1707.4万平方米。

全部查询工具

关于我们免责声明联系我们网站地图最近更新

免责说明:本站为非营利性网站,本站内容全部由《去查网》从互联网搜集编辑整理而成,版权归原作者所有,如有冒犯,请联系我们删除。

Copyright © 2020 - 2024 quchaw.com All rights reserved.浙ICP备20019715号