去查网 logo

fully dredged reclamation

中文翻译全面挖泥填海工程

同义词释义

    1)fully dredged reclamation,全面挖泥填海工程2)reclamation project,填海工程3)reclamation engineering,填海工程4)reclamation,填海工程5)dredging works,挖沙工程;挖泥工程6)reclamation,填海;填海区;填海工程

用法例句

    Influences from the reclamation projects in western part of Shenzhen Bay on the discharging capacities of the rivers flowing into the sea are studied herein with depth-averaged 2D hydrodynamic numerical model.

    利用水深平均的二维水动力数值模型对深圳西部填海工程引起的出海河流泄洪能力影响进行了研究。

    The present paper established a two-dimensional depth-integrated hydrodynamic model in the Zhanjiang Bay, and simulated the tidal current fields before and after reclamation engineering in the bay.

    建立了湛江湾二维全流水动力学模型,模拟了湛江湾宝满码头填海工程前、后的水动力场。

    The first step is to build a sea embankment for reclamation engineering,the quality of sea embankment plays an important role to secure the success of reclamation engineering,so the quality inspection of sea embankment is of great significance.

    填海工程施工时首先要填筑海堤,而海堤质量的好坏对于保证填海工程起着关键的作用。

    Reclamation brings us economic benefits and also many environmentalproblems, such as changing hydrodynamic conditions, water self-purification capacityweakened, deteriorating water quality, and causing sedimentation in harbor, and so on.

    在对国内外填海概况进行论述的基础上,总结了填海工程对海洋环境影响研究现状;论述了国内外填海工程管理理念,总结了环境影响评价的发展及海洋环境影响评价中的不足,并对评价技术手段海洋数值模式的发展及流行模式做了详细综述。

    prefabricated band drain [reclamation works]

    预制的排水带〔填海工程

    Central and Wan Chai Reclamation

    中环及湾仔填海工程

    Study on the Tsuen Wan Bay Further Reclamation

    荃湾海湾进一步填海工程研究

    Case Study on the Impacts Assessment of Reclamation on Marine Environment

    填海工程海洋环境影响评价实例研究

    Wan Chai Reclamation Phase 2 is under planning.

    湾仔填海工程第II期仍在规划中。

    Central and Wan Chai Reclamation Feasibility Study

    中环湾仔填海工程可行性研究

    The reclamation was substantially complete in 1997.

    填海工程已在一九九七年大致完成。

    Influences from Reclamation Projects in ShenZhen HouHai Bays on Discharging Capacities of Rivers;

    深圳后海湾填海工程对泄洪能力的影响研究

    Infrastructural works and developments have continued on West Kowloon Reclamation since its substantial completion in 1996.

    自从西九龙填海工程于一九九六年大致完成后,基础建设工程及发展工程已持续在填海区进行。

    Man-made Island Reclamation Study Application Technique of Soft Foundation Treatment

    人工岛填海工程软基处理应用技术研究

    During the year, about 5.2 million cubic metres of public fill were used in reclamations.

    年内,约有520万立方米的公众填料用于各项填海工程

    Research on Transport Program in Reclamation Engineering Based on Green Transportation

    基于绿色运输的填海工程运输方案研究

    Introduction to plan for sea filling and ground treatment of Ningde Nuclear Power Plant

    宁德核电厂填海工程及地基处理方案介绍

    A method for calculating biomass loss due to reclamation

    填海工程水生生物量损失计算方法的探讨

    Influence of reclamation land project from marshes on marine environment and countermeasures of protection in Zhoushan

    舟山海域围填海工程对海洋环境的影响及防治措施与对策

    Research on the Marine Environment of Reclamation Works in Xiabao Industrial City in Zhanjiang;

    湛江霞宝工业城填海工程对海洋环境影响的研究

    Impact of the sea reclamation on fishery resources in Liaoning offshore and corresponding countermeasures

    填海工程对辽宁省近海渔业资源的影响及对策

    Reclamation works for the industrial estate began in September 1995.

    第四个工业区的填海工程已于一九九五年九月展开。

全部查询工具

关于我们免责声明联系我们网站地图最近更新

免责说明:本站为非营利性网站,本站内容全部由《去查网》从互联网搜集编辑整理而成,版权归原作者所有,如有冒犯,请联系我们删除。

Copyright © 2020 - 2024 quchaw.com All rights reserved.浙ICP备20019715号