去查网 logo

indemnity period/limit

中文翻译赔期/期限

同义词释义

    1)indemnity period/limit,赔期/期限2)time limit for payment of claim,索赔期限3)payout limit,赔付期限4)beyond the time limit for claim,超过索赔期限5)extend the time limit for filing clause,延长索赔期限6)claim for extension of time,工期索赔

用法例句

    How to claim for extension of time to the construction enterprise;

    施工企业如何进行工期索赔

    Application of learning curve method in calculating the claim for extension of time;

    熟练曲线法在工期索赔计算中的应用

    The time of validity of a claim under this insurance shall not exceed a period of two year counting from the date of loss.

    被保险人的索赔期限,从损失发生之日起,不得超过两年。

    As regards claims, the time limit for quantity claims is three months, and that for quality claims twelve months.

    对于索赔期限,数量不符为三个月,质量不符为12个月。

    5000YS COTTON CLOTH EX MUSING PLEASE EXTEND TIME LIMIT FOR INSPECTION AND CLAIM TO MAY.

    木星轮运来5000码棉布,请展延检验和索赔期限至5月。

    The commodity inspection authorities shall accomplish the procedures for inspection and issue an inspection certificate within the period of validity of claims prescribed in a foreign trade contract.

    商检机构应当在对外贸易合同约定的索赔期限内检验完毕,并出具证明。

    Convention on Limitation of Liability for Maritime Claims

    海事索赔责任限制公约

    We request to extend the time limit for claim on the above shipment to July 5.

    我们要求将上述货物的索赔时间期限延长到7月5号。

    What's the deadline for claim?

    索赔的有效期多长?

    In the Insolvency Act context, a two year period is generally thought to give creditors sufficient time to make their claims.

    就破产法有关内容而言,一般说来两年期限已经给债权人足够的时间去追债索赔。

    Claim on delayed shipment is that sellers fail to make the deliery according to time schedule.

    延期索赔是对卖方没有按时装运货物而提出的索赔。

    Claim on delayed shipment is that sellers fail to make the delivery according to time schedule.

    延期索赔是对卖方没有按时装运货物而提出的索赔

    Any claim shall be lodged within 60 days from the date of import.

    自进口日期起索赔权六十天。

    The Study of Time and Cost Claims Based on FIDIC Contract Conditions;

    FIDIC合同条件下的工期及费用索赔研究

    STUDY ON THE PRINCIPLE OF DELAY CLAIMS WITH MULTI-EVENT INTERFERENCE;

    多事件干扰下工期延误索赔原则研究

    The application of network analysis method in calculating of construction period claiming;

    网络分析法在计算工期索赔中的应用

    Analysis of Clients'Counter Claim Because of Project Delay

    工期延误引起的业主反索赔分析初探

    Exploration on Period Management and Claim of Construction General Contract Project

    施工企业总承包项目工期管理与索赔的探索

    To send in one 's claim for compensation

    提出索赔,要求索赔

    Finete-time Ruin Probability with Negatively Dependence Heavy-tailed Claims;

    带负相依重尾索赔额的有限时破产概率

全部查询工具

关于我们免责声明联系我们网站地图最近更新

免责说明:本站为非营利性网站,本站内容全部由《去查网》从互联网搜集编辑整理而成,版权归原作者所有,如有冒犯,请联系我们删除。

Copyright © 2020 - 2024 quchaw.com All rights reserved.浙ICP备20019715号