去查网 logo

predetermined overhead rate

中文翻译预定间接费用分配率

同义词释义

    1)predetermined overhead rate,预定间接费用分配率2)overhead rate,间接费用分配率3)multiple overhead rate,多重间接费用分配率4)applied overhead,已分配间接费用5)overapplied overhead,多分配间接费用6)under-absorbed overhead,少分配间接费用

用法例句

    The overhead rate can be expressed as a percent-age or an hourly rate.

    间接费用分配率可以用百分比或小时费率来表示。

    That is why onehalf of the total normal working hours for a given year are used in figuring overhead rates.

    这就是为什么一个特定年度的正常工作时间的半数被用来计算间接费用分配率

    applied factory overhead expense

    已分配工厂间接费用

    applied manufacturing overhead account

    已分配间接制造费用帐户

    applied factory burden account

    工厂间接费分配帐户

    standard over head rate

    标准制造费用分配率

    applied factory overhead cost

    已分摊工厂间接费用

    OVA [overhead variance analysis ]

    间接费用差异分析[

    First, the actual production volume during the period may have been different from the production volume that was expected at the beginning of the period when the standard overhead application rate was established.

    一是特定期间的实际产量可能和标准制造费用分配率制定时预期的标准产量不同。

    The standard overhead rate is determined by dividing the standard factory overhead costs by the standard amount of productive capacity.

    制造费用标准分配率由标准生产能力决定。

    Analysis on Distribution Structure and Employ Efficiency of the Funds for Science and Technology in Jiangsu Province;

    江苏省科技经费配置结构与使用效率分析

    Intergovernmental Working Group on Overhead Costs

    间接费用政府间工作组

    "direct overhead Budget: In the World Bank, a Budget for those overhead expenses controlled by the manager."

    直接管理的间接费用预算: 指在世界银行内直接由经理控制的那部分间接费用的预算。

    Survey on Direct Cost and Indirect Cost of Inpatient;

    患者住院期间直接费用与间接费用的调查研究

    Bounding efficiency loss of multiclass stochastic user equilibrium traffic assignment under road pricing

    收费情形下多用户类随机用户均衡交通分配的效率损失上界

    being effective without wasting time or effort or expense.

    有效率而且不浪费时间、精力或者费用。

    Remember that when the standard costs are used, factory overhead is applied to production on the basis of a predetermined standard cost overhead rate.

    在标准成本制度下,制造费用根据一事先确定的比率进行分配。

    summary of cost of manufacturing expenses applied

    己分配制造费用汇总表

全部查询工具

关于我们免责声明联系我们网站地图最近更新

免责说明:本站为非营利性网站,本站内容全部由《去查网》从互联网搜集编辑整理而成,版权归原作者所有,如有冒犯,请联系我们删除。

Copyright © 2020 - 2024 quchaw.com All rights reserved.浙ICP备20019715号