去查网 logo

project mark

中文翻译项目标记

同义词释义

    1)project mark,项目标记2)project objective,项目目标3)project object,项目目标4)project goal,项目目标5)item memory,项目记忆6)item mark,项目记号

用法例句

    The Quantitative Analysis of Project Objective Flexible Control Based on Double Base Points;

    基于双基点法的项目目标柔性控制的定量分析

    Only having an integrated plan and measurement of objective,the realization of project objective can be successfully achieved.

    建设项目目标三角中,各目标是相互联系的,目标的规划和目标实施绩效的评估是目标控制的重要内容,只有对各目标进行集成的规划,并在实施过程中对其实施绩效进行评估,才能保证项目目标的实现。

    To deal with the lack of effective project management in corporation,this paper puts forward new e- valuation concept,based on enterprise resource planning(ERP)project management theory,which is to evalu- ate the performance of ERP project by checking the achievement of project object.

    针对制造企业缺乏有效的项目管理导致项目失败的问题,提出了以ERP项目管理理论为基础,从项目目标实现程度角度评价ERP项目的实施效果的观点。

    In order to ensure the project object completing,the control capacity of the major engineer for the project object is very important?The article analyzes the major engineer s responsibility, combines with engineering supervise practice and experience, putting forward the suggestions about how to improve the control capacity for the project object.

    随着中国加入WTO和建筑市场的越加规范 ,项目总监理工程师已成为项目管理的核心 ,为保证项目目标的实现 ,总监理工程师对项目目标控制的预见能力尤为重要。

    The project goal is controlled within the plan made before hand together with the effective means.

    建设工程项目目标的控制是贯穿项目的整个建设过程。

    A study of source memory and item memory in first episode patients with schizophrenia;

    首发精神分裂症患者的源记忆与项目记忆

    Source memory was more affected by aging than item memory.

    来源记忆不同于项目记忆,它更容易受年老化的影响,与这一现象有关的因素既有生理的又有心理的,前额皮层功能老化是影响老年人来源记忆的生理因素,而注意分配困难以及记忆加工困难是影响老年人来源记忆的两个重要心理因素。

    Recent studies about the behavioral characteristics and neural basis of item memory and source memory indicate that they are two different psychological processions.

    采用事件相关电位(ERP)方法研究大学生图形项目记忆与位置来源提取新/旧效应的时、空分布特征。

    Mark item as read when selection changes

    当选定内容更改时将项目标记为“已读”

    The distributor could not mark the work item as failed.

    分发服务器无法将工作项目标记为 "已失败"。

    The distributor could not mark the work item as ended.

    分发服务器无法将工作项目标记为 "已结束"。

    The distributor could not mark the work item as started.

    分发服务器无法将工作项目标记为 "已启动"。

    object of entry

    描述体客体;项补语;记入目的;记入项目标

    Project Goals (double click square sign on left to expand list)

    项目目标 (双击左边的方块标记展开列表)

    Include items with "Do not AutoArchive" checked

    包含带“不自动存档”标记的项目

    One or more of the items could not be unmarked for deletion.

    有一个或多个项目无法标记为删除。

    %1:Folder:%2: Syncing marked Items.%0

    %1:文件夹:%2: 同步已标记项目。%0

    Cannot add a follow-up flag to this item. The folder type may not support message flags.

    无法给该项目添加后续标记。该文件夹类型可能不支持邮件标记。

    Cannot add a message flag to this item. The folder type may not support message flags.

    不能给该项目添加邮件标记。文件夹类型可能不支持邮件标记。

    You cannot set the Message Flag, Flag Status, or Due By fields for this item.

    不能设置该项目的“邮件标记”、“标记状态”或“到期时间”字段 。

    Please verify each item you have pricked down.

    请把你已用小记号标出的每一个项目核对一下。

    To open the item, document, or contact in a journal entry, double-click the icon in the journal entry.

    要在日记条目中打开项目、文档或联系人,请双击在日记条目上的图标。

    Flagging marks an item to remind you that it needs to be followed up. After it has been followed up, you can mark it complete.

    为项目添加标志可提醒您需要对该项进行后续工作。完成后续工作后,您可将其标记为“已完成”。

    Put a tick in the box next to the settings you want to personatise.

    在你想要个性化项目旁边的方框中标入一个记号。

    Select the field from the currently open projects\\nthat contains the indicator criteria to import:

    请从当前打开的项目中选择包含要导入的标记规则的域:

    (xviii) The Item and Standard of Registration Expenses of Computer Software (18 April 1992)

    (xviii)计算机软件著作权登记收费项目和标准(1992年4月18日)

全部查询工具

关于我们免责声明联系我们网站地图最近更新

免责说明:本站为非营利性网站,本站内容全部由《去查网》从互联网搜集编辑整理而成,版权归原作者所有,如有冒犯,请联系我们删除。

Copyright © 2020 - 2024 quchaw.com All rights reserved.浙ICP备20019715号