shaft penetration
同义词释义
- 1)shaft penetration,竖井穿孔2)partially penetrated vertical drains,未打穿竖井3)ground with partially penetrated vertical drains,未打穿竖井地基4)cable vault,人孔,检修孔;电缆竖井5)partially penetrated vertical drains,未打穿竖向排水井6)shaft well,竖井
用法例句
Soil of consolidation with partially penetrated vertical drains under complicated loadings considering three-dimensional seepage in soil beneath vertical drain;
复杂荷载作用下考虑下卧层三维渗流的未打穿竖井地基固结分析
Consolidation theory for soft soil with partially penetrated vertical drains;
未打穿竖向排水井地基固结理论
The most of shaft wells of TGP s permanent shiplock characterize as large section, shaft well group, double steel bar, and large amount of accurately embedded metal structure and especially for the lower shiplock chamber section, the structure is complicated and the steel bar is dense.
三峡水利枢纽永久船闸竖井多为大断面、多井群组合结构,且为双层钢筋,又有大量高精度要求的金结埋件,尤其是下部闸室段结构复杂,钢筋密集,因此工作量大,施工干扰大,施工难度大。
The outfall pressure shaft well in the third-step pumping station of main canal of Wanjiazhai Huanghe Water Transfer Project in Shanxi Province is lined with reinforced concrete and constructed by using hydraulic climbing form.
山西省万家寨引黄工程总干三级泵站出水压力竖井为钢筋混凝土衬砌 ,采用了液压滑升模板施工 ,节省了多次立模和拆模工序 ,加快了施工进度。
In order to protect the cast concrete at the shaft well section of the power tunnel against corrosion by several strong corrosive mediums,a protection project at the outer sidewall of the shaft well is needed.
“6 35”水利枢纽已浇筑的发电洞竖井混凝土受到多种强腐蚀介质的侵蚀影响 ,需在竖井外壁进行加强性工程防腐处理 。
The shaft of a mine.
竖坑矿的矿井或竖井
shaft-sinking [caisson works]
打/挖竖井〔沉箱工程〕
multi-level outlet shaft spillway
多层进水竖井式溢洪道
Tsiu Keng Shaft Raw Water Irrigation Pump House
蕉径竖井原水灌溉泵房
Cheung Sha Shaft Raw Water Pumping Statio
长沙竖井原水抽水站
Lining Slipform Construction Technology of Sending and Exhausting Single-shaft
单井送排风式竖井衬砌滑模施工技术
The excavation speed of pilot shaft is one of the key difficulties for the excavation of shaft, high ones in special, of hydropower works.
水电工程竖井特别是高竖井开挖,主要难点体现在竖井导井开挖的速度上。
Flooding of three vertical shafts trapped the miners as they changed shifts.
三个竖井发生透水,把正在换班的工人困在井下。
The 3# Ventilation Shaft back well method Construction Technology of Qinling Zhongnanshan Highway Tunnel
秦岭终南山公路隧道3#竖井反井法施工技术
Shaft Liner Design of Development Shaft for Phase Ⅲ Project in Lancang Lead Mine
云南澜沧铅矿三期开拓竖井井筒的支护设计
Frozen method applied in excavation of vertical shaft of iron ore mine
冻结法凿井技术在铁矿山竖井中的应用
Research on the preliminary thickness design of shaft lining in porous rock aquifer
孔隙型含水基岩段竖井井壁厚度拟订设计研究
Anti-well construction technique of 3# shaft of Zhongnanshan road tunnel in Qinling
秦岭终南山公路隧道3号竖井反井法施工技术
Summarization on large diameter vertical shaft back well method excavation construction technology
关于大直径竖井反井法开挖施工技术概述
In-situ measurement and analysis of freezing pressure of vertical shaft lining in deep alluvium
特厚冲积层竖井井壁冻结压力的实测与分析
access shaft [aviation fuel receiving facility]
进出竖井〔飞机燃料接收设施〕
It runs down a shaft to the seventh floor.
它沿一个竖井向下直通到第七层。
The air flows down to a shaft and thus loses potential energy.
空气向下进入竖井,因而失去势能。
相关英语词汇
- strain ageing是什么意思
- seismology是什么意思
- suck and blow apparatus是什么意思
- special extinguishing agent是什么意思
- steering pump location是什么意思
- sieve classification,screen clasaification是什么意思
- Set Periodically Restarting Time是什么意思
- subsonics是什么意思
- solid symbol是什么意思
- steering control unit drive是什么意思
- steam flow rate是什么意思
- source code是什么意思
- steam coal是什么意思
- surface mounting adhesives是什么意思
- Select Error是什么意思
- sinusoidal fold是什么意思
- sunspot是什么意思
- singular integral element是什么意思
- scrotoplasty是什么意思
- shale line是什么意思
- steam return line是什么意思
- Sirtl etching是什么意思
- solancoyte是什么意思
- static compressive modulus of elasticity是什么意思
- servicing time是什么意思
- swing gate是什么意思
- service access是什么意思
- short lived radioactive substance是什么意思
- solvent transfer coefficients是什么意思
- social deviance是什么意思