去查网 logo

two point workability test

中文翻译由双因素试验施工和易性

同义词释义

    1)two point workability test,由双因素试验施工和易性2)workable performance,施工和易性3)dual factors test,双因素试验4)work factor test,工作因素试验5)construction test,施工试验6)easy act,易施工性

用法例句

    Through adding low viscidity Hydroxypropyl Methyl Cellulose,workable performance of the dry mix can be most improved,but compress strength reduce.

    通过掺入低粘度的羟丙基甲基纤维素后,砂浆的施工和易性能得到了极大的改善,但强度有所降低。

    Through adding low viscidity HPMC,workable performance of the dry-mixed mortar can be greatly improved,and this dry-mixed mortar can well solve the crack problem of wall.

    通过掺入低粘度的羟丙基甲基纤维素后,砂浆的施工和易性能得到了极大的改善,可以较好地克服新型墙材出现的墙体裂缝等问题。

    Study of the dual factors test by analysis of variance;

    利用方差分析研究双因素试验

    Working performance and evaluation index of fly-ash graded aggregates

    粉煤灰级配碎石的施工和易性及其评价指标

    Analysis on the Illegality of the Trade-based Production and Process Methods;

    针对产品生产和加工方法贸易措施的违法性分析

    This valve does not function well in corrosive service. Because of its design, materials of construction, and surface finish, the valve is very prone to corrosion.

    这种阀门在腐蚀性设施中无法正常工作。由于它的设计、建材和表面加工,阀门很容易腐蚀。

    Seismic hazard mapping for the vulnerability assessment of industrial facilities

    工业设施地震灾害易损性评估图的绘制

    The working conditions in a factory are far more amenable than those on a site, and this permits continuous production.

    在工厂里,工作条件比施工现场更容易控制,从而保证生产的持续性。

    The Effect of Technical Barrier to Trade on Our Foreign Trade & the Countermeasures;

    技术性贸易壁垒对我国出口贸易的影响和应对措施

    The organization shall establish and implement a system for production tooling management including tool-change programmes for perishable tools.

    组织应建立和实施生产工装管理的系统包括易损工装的更换计划。

    licensing arrangement

    特许制造措施〔工业署〕;签证措施〔贸易署〕

    Construction Technology for Mine Shaft Sinking Bysimple f Metal Ring Open Caisson Method and Synthetic Grouting Wall Construction Method

    简易金属井圈沉井法和壁后注浆综合施工法过井筒流沙层施工技术

    Thought and Countermeasure of Technical Trade Step, Strategy and Early-warning Engineering for Chinese Fluid Machinery Industry;

    中国流体机械行业技术性贸易措施战略与预警工程的思路与对策

    When installing steel tubular piles in regions where granite is shallowly overburdened, the piles are easy to deviate and the pile tip is easy to warp, resulting in slow driving.

    在浅覆盖层花岗岩地区进行钢管桩施工,存在易偏位、桩尖易卷口和进度慢等技术难题。

    Trade Remedies of WTO and Strategic Trade Policy

    世界贸易组织贸易救济措施与战略性贸易政策

    "Description of any dangerous and/or inflammable goods indicating names, properties, special protective measures and handling methods in case of accident"

    易燃品和危险品的名称、性质、特殊防护措施及事故处理方法说明书

    Necessity and Feasibility of Birth DefectionIntervention in China;

    实施出生缺陷干预工程的必要性和可行性

    Design and construction of the old asphalt pavement semi-rigid base structure performance restoration

    老沥青路面半刚性基层性能恢复的设计和施工

    The text introduce a handy method during subgrade or pavement base construct named" one line" method, and showed its peculiarity and applicable performance.

    介绍了在路基、面基层施工中采用的一种简便的施工方法“一线控制施工法”及它的特点和应用性。

    The speed of work and easiness of programming were also improved.

    工作速度和编程的简易性也都得到改善。

    Game Theory Analysis on the Trade Protection in International Trade;

    国际贸易中战略性贸易保护的博弈分析——兼谈反倾销、特别保障措施和绿色壁垒

全部查询工具

关于我们免责声明联系我们网站地图最近更新

免责说明:本站为非营利性网站,本站内容全部由《去查网》从互联网搜集编辑整理而成,版权归原作者所有,如有冒犯,请联系我们删除。

Copyright © 2020 - 2024 quchaw.com All rights reserved.浙ICP备20019715号