去查网 logo

wooden headframe

中文翻译木井架

同义词释义

    1)wooden headframe,木井架2)wood derrick,木制井架3)shaft timbering,井筒木支架4)derrick,井架5)drilling derrick,井架6)mast,井架

用法例句

    Stress analysis of four-leg K type derrick and its substructure during the integral hoisting of the derrick;

    起升中四腿落地式K型井架及底座的应力分析

    The analysis of FEM simulation of raising of derrick;

    井架起升过程的有限元仿真分析

    Method for calculating Stability of solid axis pressure bar used on derricks;

    井架实腹式轴心压杆稳定性计算新方法

    To evaluate the safety bearing capacity of drilling derrick, a novel method is proposed based on frequency and load descending coefficient by the research of vibratipn theory, finite element model and experimental analysis of simple model of drilling derrick.

    通过井架结构振动理论、有限元分析和实验室简易模型的试验研究,提出了以振动频率为基准,载荷下降系数为依据诊断钻井井架结构安全承载能力的方法。

    Three kinds of drilling derricks for drilling a well of 3200 meters are used at present, including tower shape, K shape and A shape.

    对在用的3200m钻机的塔型、A型和K型井架抗扭特性进行了分析,以满足正在发展的顶驱钻机的需要。

    The principle of the predominance in the design for the mast;

    井架结构设计中的优势原则

    Procedures for manufacturing the type JJ450 mast of the offshore drilling rig;

    JJ450型海洋钻机井架制造工艺

    Calculation of Static Stress and Stability of Model JJ225/43-K Mast;

    JJ225/43-K石油钻机井架强度及稳定性计算

    "drilling rig, platform"

    "钻井井架,钻井平台,见 oil (drilling) rig"

    bald-headed derrick

    无天车工作平台的井架

    stacking capacity of derrick

    井架的钻杆立根容量

    leg base anchorage

    井架大腿底脚的固定

    self-gured structural mast

    自带绷绳的轻便井架

    free standing mast

    不用绷绳的轻便井架

    outside monkey board

    折叠式井架外侧二层台

    On the Derrick Installation of ShaftⅣ_G In main Shaft of a Coalmine

    浅谈塔然高勒煤矿主井IV_G凿井井架安装

    The Intensity Testing of Main Well Headframe in Dai Zhuang Mine Shangdong

    山东岱庄生建煤矿主井井架强度检验

    A finite element analysis of headframe intensity of 40-ton workover rig;

    40t修井机井架强度的有限元分析

    Here and there at long distances upon the canon sides rose the headframes of a mine.

    峡谷两侧,一路过去,到处屹立着矿井井架

    Research on the Influence of Frost Heave of Frozen Soil to Derrick Footing in Freezing Sinking Shaft;

    冻结法凿井冻土冻胀对井架基础影响的研究

    The Designing of Observing Zhangbei s Chief Mine s Headframe s Base s Subsidence and Deformation;

    张北主井井架基础沉降及变形观测设计

    Study on the Subsidence Monitoring of Main and Auxiliary Shaft Headframe Foundations of WOLONG LAKE Coal Mine

    卧龙湖煤矿主副井井架基础沉降监测研究

    New construction technology of setting large steel-structure shaft frame during shaft sinking

    凿井期间起立大型钢结构井架施工新技术

    Application of the high tensile material to the substructure of the super-deep well's rig derrick

    高强度材料在超深井钻机井架底座中的应用

    Preliminary Study on Well Drilling Technique of Semi-Submersible Drilling Platform with Dual Derrick Rig

    半潜式钻井平台双井架钻机作业工艺初步研究

    Analysis of Stress and Distortion of Derrick With Fem

    石油修井机井架的有限元应力应变分析

全部查询工具

关于我们免责声明联系我们网站地图最近更新

免责说明:本站为非营利性网站,本站内容全部由《去查网》从互联网搜集编辑整理而成,版权归原作者所有,如有冒犯,请联系我们删除。

Copyright © 2020 - 2024 quchaw.com All rights reserved.浙ICP备20019715号